BCA Submissions via CORENET-X — end-to-end lodgement, not just endorsement.

From 1 October 2026 every Building Plan in Singapore must be lodged through CORENET-X. BIM-based files, standardised digital signatures, and integrated regulatory checks across BCA, SCDF, NEA, URA, and PUB in a single submission flow. CVC Engineers handles the complete workflow.

Get a submission quote

What CORENET-X changes for your submission.

CORENET-X is BCA Singapore's next-generation digital submission platform — replacing the legacy CORENET system with BIM-based files, standardised digital signatures, and unified multi-agency review. It is mandatory for all Building Plan submissions from 1 October 2026.

The legacy CORENET system was a 2D PDF + DWG workflow with sequential, separate submissions to each agency. Under CORENET-X, the submission package is:

  • BIM-based — IFC-format models with embedded metadata, replacing flat 2D drawings
  • Multi-authority — single submission triggers parallel reviews by BCA, SCDF, NEA, URA, PUB, and other relevant agencies
  • Digitally signed — all PE / QP endorsements use standardised digital signature certificates
  • Auto-checked — geometric clash detection, spatial planning rules, and compliance pre-checks happen automatically before formal review
  • Tracked in real time — applicant, QPs, and authorities all see the same dashboard with current submission status

For applicants, this changes how the submission is prepared — not whether a submission is required. The Building Control Act still mandates Building Plan approval before commencement of any structural works.

The submission types CVC Engineers handles:

  • BP (Building Plan) — architectural + structural + M&E for new builds, A&A, demolition
  • ST (Structural Plan) — standalone structural-only submission, common for industrial / refurb projects
  • WP (Works Plan) — site-specific works including ERSS, dewatering, piling
  • FSP (Fire Safety Plan) — to SCDF, integrated under CORENET-X
  • SD (Sanitary & Drainage) — to PUB, integrated under CORENET-X
  • EP (Environmental Plan) — to NEA where applicable
  • WSL (Written Permission for Land) — to URA
  • RSL (Railway Safety Liaison) — to LTA where in MRT Restricted Zone
  • TOP / CSC submission — final occupation permit and statutory completion certificate
CORENET-X (BCA) ↗ BCA Singapore ↗ BC Act · CORENET-X Mandate BIM-based IFC submission

The CORENET-X submission flow.

From BIM model to TOP — every authority interaction your project will go through. The schematic below is exactly the flow CVC Engineers manages on your behalf.

DWG · CVC-BCA-001 CORENET-X SUBMISSION FLOW · BIM PACKAGE → MULTI-AUTHORITY → APPROVAL SCHEMATIC REV A · 2026-05
SCHEMATIC · CORENET-X SUBMISSION WORKFLOW ① BIM PACKAGE · ARCH.IFC · STR.IFC · MEP.IFC · CALC.PDF · FSP.PDF · DWG.SET · SS01–08 · CHECK PRE PREPARED BY: QPs UPLOAD CORENET-X UNIFIED REVIEW PLATFORM BIM-BASED · DIGITALLY SIGNED AUTOMATED PRE-CHECKS: ✓ GEOMETRIC CLASH ✓ PLANNING RULES ✓ COMPLIANCE PRE-CHECK PREP: 2-8 WEEKS BCA Building Plan Structural · ERSS Buildability 4–8 wk REV SCDF Fire Safety Plan FSP-1 · FSP-2 Egress · Sprinkler 4–6 wk REV URA Written Permission Land · Density Conservation 2–6 wk REV NEA Environmental Noise · Dust · Waste Hawker Layout 2–4 wk REV PUB Sanitary · Drainage Water Supply Sewer Connection 2–6 wk REV LTA (CONDITIONAL) Railway Protection Road Reserve If < 40m from MRT PARALLEL CLEAR ⟲ QUERY / RESPONSE LOOP BY QPs · MANAGED BY CVC CONSOLIDATED APPROVAL CONSTRUCTION → TOP → CSC Building works · Site supervision · Completion Final BCA inspection · Statutory clearance · Handover CVC ENGINEERS HANDLES ✓ BIM model preparation ✓ Drawing & calc package ✓ QP-S endorsement ✓ Digital signature lodgement ✓ CORENET-X upload ✓ Authority query response ✓ Re-submission tracking ✓ Approval & close-out ✓ TOP & CSC submission YOU DO NOT DEAL WITH BCA / SCDF / NEA / URA / PUB CVC ENGINEERS PTE LTD DWG · CVC-BCA-001 CORENET-X SUBMISSION FLOW SCHEMATIC · NTS DATE · 2026-05-10 DRN BY · CVC PE QP-S · PEB REG NO 5376 SIGNED · DATED · SEALED © 2026 CVC ENGINEERS
SHEET 01/02 · SUBMISSION WORKFLOW DIAGRAM PEB 5376 SEAL CHECKED · 2026-05-10 APPROVED · QP-S

CORENET-X submission cost ranges.

Indicative 2026 fees for CVC's submission service (excluding BCA / SCDF / URA / NEA / PUB authority fees, which the applicant pays separately).

Submission scopeProject typeIndicative fee (SGD)Notes
Standalone ST submissionIndustrial / refurb8,000 – 18,000Structural-only, no architectural change
BP — landed homeSingle house12,000 – 30,000Includes BIM prep, FSP, SD package
BP — small commercial / F&B fit-outStrata or shophouse10,000 – 25,000Includes change-of-use clearance
BP — mid-rise commercial / mixed-use5,000 – 15,000 m² GFA35,000 – 80,000Multi-stage, multi-authority
BP — large new build (high-rise)> 15,000 m² GFA80,000 – 300,000+Quote on detailed scoping
Authority query response onlyPer RFQ cycle2,500 – 8,000If endorsement was done by another firm
TOP / CSC submissionFinal clearance5,000 – 15,000As-built dwgs, completion certificates

Ready to submit? Send the project.

Drawings, address, brief description. We reply within one working day with a written, itemised CORENET-X submission quote.

Get a submission quote