BCA Submissions via CORENET-X — end-to-end lodgement, not just endorsement.
From 1 October 2026 every Building Plan in Singapore must be lodged through CORENET-X. BIM-based files, standardised digital signatures, and integrated regulatory checks across BCA, SCDF, NEA, URA, and PUB in a single submission flow. CVC Engineers handles the complete workflow.
Get a submission quoteWhat CORENET-X changes for your submission.
CORENET-X is BCA Singapore's next-generation digital submission platform — replacing the legacy CORENET system with BIM-based files, standardised digital signatures, and unified multi-agency review. It is mandatory for all Building Plan submissions from 1 October 2026.
The legacy CORENET system was a 2D PDF + DWG workflow with sequential, separate submissions to each agency. Under CORENET-X, the submission package is:
- BIM-based — IFC-format models with embedded metadata, replacing flat 2D drawings
- Multi-authority — single submission triggers parallel reviews by BCA, SCDF, NEA, URA, PUB, and other relevant agencies
- Digitally signed — all PE / QP endorsements use standardised digital signature certificates
- Auto-checked — geometric clash detection, spatial planning rules, and compliance pre-checks happen automatically before formal review
- Tracked in real time — applicant, QPs, and authorities all see the same dashboard with current submission status
For applicants, this changes how the submission is prepared — not whether a submission is required. The Building Control Act still mandates Building Plan approval before commencement of any structural works.
The submission types CVC Engineers handles:
- BP (Building Plan) — architectural + structural + M&E for new builds, A&A, demolition
- ST (Structural Plan) — standalone structural-only submission, common for industrial / refurb projects
- WP (Works Plan) — site-specific works including ERSS, dewatering, piling
- FSP (Fire Safety Plan) — to SCDF, integrated under CORENET-X
- SD (Sanitary & Drainage) — to PUB, integrated under CORENET-X
- EP (Environmental Plan) — to NEA where applicable
- WSL (Written Permission for Land) — to URA
- RSL (Railway Safety Liaison) — to LTA where in MRT Restricted Zone
- TOP / CSC submission — final occupation permit and statutory completion certificate
The CORENET-X submission flow.
From BIM model to TOP — every authority interaction your project will go through. The schematic below is exactly the flow CVC Engineers manages on your behalf.
CORENET-X submission cost ranges.
Indicative 2026 fees for CVC's submission service (excluding BCA / SCDF / URA / NEA / PUB authority fees, which the applicant pays separately).
| Submission scope | Project type | Indicative fee (SGD) | Notes |
|---|---|---|---|
| Standalone ST submission | Industrial / refurb | 8,000 – 18,000 | Structural-only, no architectural change |
| BP — landed home | Single house | 12,000 – 30,000 | Includes BIM prep, FSP, SD package |
| BP — small commercial / F&B fit-out | Strata or shophouse | 10,000 – 25,000 | Includes change-of-use clearance |
| BP — mid-rise commercial / mixed-use | 5,000 – 15,000 m² GFA | 35,000 – 80,000 | Multi-stage, multi-authority |
| BP — large new build (high-rise) | > 15,000 m² GFA | 80,000 – 300,000+ | Quote on detailed scoping |
| Authority query response only | Per RFQ cycle | 2,500 – 8,000 | If endorsement was done by another firm |
| TOP / CSC submission | Final clearance | 5,000 – 15,000 | As-built dwgs, completion certificates |
Often paired with BCA submissions.