PE Endorsement — the Professional Engineer's signature that BCA needs to see.

Under Singapore's Building Control Act, most structural works require a registered Professional Engineer (Civil) to sign off the plans, calculations, and methodology before BCA will approve them. CVC Engineers' QP-S endorsement is what unlocks BCA Building Plan approval, CORENET-X submission, and ultimately your TOP and CSC.

Get a PE quote

What PE endorsement actually means.

A PE endorsement is a registered Professional Engineer's formal sign-off on the structural design, calculations, and submission documents for a building project. It is a legal declaration under the Professional Engineers Act that the design complies with all applicable Singapore codes and is fit for construction.

In Singapore, the Professional Engineer is formally appointed under Section 9 of the Building Control Act as the Qualified Person — Structural (QP-S). The QP-S takes legal responsibility for:

  • Structural design integrity (gravity, wind, seismic, fire)
  • Compliance with Eurocodes (SS EN 1990 through SS EN 1999) as adopted by Singapore
  • BCA submission completeness — drawings, calculations, specifications
  • Site supervision regime and inspection records (Section 12 BCA)
  • Response to BCA queries and resubmissions
  • Final structural sign-off for TOP and CSC

The endorsement carries the PE's practising certificate number, PEB registration number, and physical seal. CVC Engineers' QP-S is registered under PEB Reg No 5376.

When BCA requires PE endorsement:

  • All new builds (residential, commercial, industrial)
  • Additions & Alterations (A&A) affecting structure or footprint
  • Demolition works (full or partial)
  • Change of use that affects loading
  • Mezzanine additions, basement extensions, roof conversions
  • Façade modifications and curtain wall replacements
  • Structural strengthening, underpinning, fibre-reinforced retrofit
  • Temporary works (scaffolding, formwork, hoarding)
  • Periodic Structural Inspection (PSI) for older buildings

When PE endorsement is not required: non-structural cosmetic works — repainting, replacement of fittings, internal partitions that don't affect loading, kitchen / bathroom fit-out without wall removal.

BCA Singapore ↗ PEB Singapore ↗ BC Act s.6 + s.9 + s.12 SS EN 1990–1999 (Eurocodes)

A real PE endorsement structural sheet.

Plan view of a typical commercial floor plate with column grid, beams, and load takedown to a single column — exactly the kind of submission that carries the QP-S signature and seal.

DWG · CVC-PE-001 STRUCTURAL FRAMING PLAN · LEVEL 5 TYPICAL · LOAD TAKEDOWN COL B-3 SCALE 1:100 REV B · 2026-05
① STRUCTURAL FRAMING PLAN — L5 TYPICAL A B C D E F 1 2 3 4 5 SLAB SPAN ↓ LIFT-1 LIFT-2 STAIR-1 SHAFT ATRIUM VOID B-3 · TAKEDOWN TRIB AREA = 19.6m² 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 6.0 RB1: 350×600 · 4-T20 BOT · 2-T16 TOP SB1: 250×500 · 3-T16 BOT SLAB · 200mm RC · GRADE C40/50 ② COL B-3 LOAD TAKEDOWN RF +25.5 F8 F7 F6 F5 F4 F3 F2 F1 GF PILE CAP 98 kN 186 kN 274 kN 362 kN 450 kN 540 kN 628 kN 716 kN 820 kN ≈940 kN ULS B-3 CALCULATION SDL = 3.0 kPa LL = 4.0 kPa (OFFICE) w_ULS = 1.35×SDL + 1.5×LL = 4.05 + 6.00 = 10.05 A_TRIB = 7×7/4×4 = 19.6 m² P/floor = 10.05 × 19.6 = 197 kN P_TOT = 8 floors + roof N_ED ≈ 940 kN COL 400×400 R8-T20 OK ✓ NOTES 1. CONCRETE C40/50 2. REINF B500B · SS EN 10080 3. COVER SLAB 25mm 4. COVER BEAM 30mm 5. COVER COL 35mm 6. DESIGN TO SS EN 1992-1-1 7. WIND TO SS EN 1991-1-4 8. SDL · 3.0 kPa 9. LL · 4.0 kPa OFFICE 10. SLAB SPAN DIRECTION SHOWN BY ARROWS. 11. FIRE RATING 2 HR. 12. ALL DIMS IN mm UNO. CVC ENGINEERS PTE LTD PROJECT COMMERCIAL OFFICE · 8F + 2B DRAWING FRAMING · L5 · TAKEDOWN B-3 SCALE · 1:100 DATE · 2026-05-10 DRN BY · CVC PE QP-S CIVIL · PEB 5376 ENDORSED · SIGNED DATE: 2026-05-10 PEB SEAL N
SHEET 04/22 · STRUCTURAL FRAMING + CALCULATION SET PEB 5376 SEAL CHECKED · 2026-05-10 APPROVED · QP-S

PE endorsement cost ranges.

Indicative 2026 figures. Excludes BCA fees. Send drawings; written quote in one working day.

ScopeGFA / extentIndicative fee (SGD)Notes
Minor A&A (no structural change)≤ 50 m²2,000 – 4,000Internal alterations, fittings, non-loadbearing partitions
Major A&A (with structural change)50 – 200 m²5,000 – 15,000Wall removal, opening, mezzanine, façade change
Landed home — new build (2-storey)300 – 600 m²15,000 – 35,000Full structural design + endorsement
Landed home — new build (3-storey + basement)500 – 1,000 m²25,000 – 60,000Bundle with ERSS likely
Commercial / office new build5,000 – 30,000 m² GFA40,000 – 200,000+By GFA. Multiple submission stages.
Industrial / warehouse3,000 – 15,000 m² GFA25,000 – 90,000Portal frame, racking review, dock leveller
Demolition plan endorsementPer building5,000 – 25,000Standalone or pre-A&A scope
Independent QP-S (architect-led project)Per assignment8,000 – 40,000PE endorsement of architect-led submission

Need PE endorsement? Send the project.

Drawings, address, brief description. We reply within one working day with whether endorsement is needed and an indicative fee.