Jurong Island PE — petrochemical, refinery, JTC industrial on Singapore's reclaimed island.

CVC Engineers serves Jurong Island's petrochemical complex, oil refineries, tank farms, pipe-rack supports, and JTC industrial buildings. From new builds to PSI inspections to ERSS for tank farm bunds. Compliance with BCA, JTC, NEA, and SCDF — at petrochemical safety class.

Get a Jurong Island quote

What makes Jurong Island PE work different.

Jurong Island is the most concentrated petrochemical hub in Southeast Asia. Over 100 multinational chemical companies operate on 32 km² of reclaimed land, all behind a JTC-controlled access perimeter. That changes the regulatory baseline, the safety class, and the inspection regime.

Project types CVC Engineers handles on Jurong Island:

  • Petrochemical plant new builds, expansions, and de-bottlenecking
  • Tank farm bund design, dyke wall PE endorsement, secondary containment
  • Pipe-rack support structural design and seismic check
  • Refinery process unit foundation review
  • JTC industrial buildings — Type-A, Type-B, multi-tenanted
  • Tower platforms, distillation column supports, vessel skirts
  • Tank farm dyke breach analysis (NEA / MPA flood protection)
  • Periodic Structural Inspection of older JI assets
  • ERSS for tank farm pile foundations, basement excavation
  • Causeway approach structural assessment

Why JI projects need a PE who knows the regulatory stack:

  • JTC compliance — JTC is both landlord and regulator. Submission goes through JTC's Customer Service Centre before BCA.
  • Major Hazard Installations (MHI) — petrochemical assets are MHI under MOM/NEA rules. Structural failure has off-site consequences.
  • Higher safety class — SS EN 1990 Consequence Class CC3 is typical (vs CC2 for normal commercial). Higher partial factors throughout.
  • SCDF Petrochemical Code — fire protection requirements far exceed standard buildings.
  • NEA pollution control — secondary containment (bund) sized for 110% of largest tank + rainfall
  • MPA causeway controls — heavy haulage to JI requires MPA permits and causeway load assessments

CVC Engineers handles the full multi-authority submission workflow. You don't need to coordinate JTC, BCA, NEA, SCDF, MPA separately.

A real Jurong Island tank-farm sheet.

Site plan + bund cross-section for a typical petrochemical storage facility. Multi-color overlay shows tank capacity, bund containment volume check, fire-water ring main, and access road LTA-causeway loading path — exactly the format JTC and NEA expect on submission.

DWG · CVC-JI-001 JI TANK FARM · SITE PLAN · BUND SECT A-A · CONTAINMENT CALC SCALE 1:1000 / 1:200 REV C · 2026-05
① SITE PLAN — TANK FARM A1 ② BUND SECT A-A · CONTAINMENT JTC LEASE BOUNDARY · 220m × 180m BUND WALL · 1.8m HIGH · RC C40/50 T-101 5,000 m³ T-102 5,000 m³ T-103 5,000 m³ T-201 12,000 m³ · LARGEST T-301 3,500 m³ PIPE-RACK FIRE-WATER RING MAIN · DN300 · 8 HYDRANTS A A' ACCESS ROAD · LTA 220m FRONTAGE N PLAN LEGEND TANK · CYLINDRICAL · API 650 CRITICAL TANK · LARGEST · CONTAINMENT BASIS PIPE-RACK · STEEL FRAME FIRE-WATER RING MAIN SECTION LINE A-A SECTION A-A · BUND CONTAINMENT BUND FLOOR · HDPE LINER + CONCRETE T-201 12,000 m³ PRODUCT LEVEL BUND VOLUME (110% × LARGEST + RAIN) 1.8m 42m 28m PIPE-RACK NEA CONTAINMENT CALC LARGEST TANK = T-201 = 12,000 m³ REQ_CONT = 110% × 12,000 = 13,200 m³ + 24-HR RAIN @ BUND AREA = 850 m³ REQ TOTAL = 14,050 m³ MIN PROVIDED: BUND FOOTPRINT = 42m × 28m × 1.8m DEEP = 2,116 m² × 1.8 = 3,809 m³ - DISPLACED VOL (TANKS+PLINTHS) = 1,150 m³ NET BUND CAPACITY = 14,250 m³ ✓ > 14,050 OK CVC ENGINEERS · JURONG ISLAND TANK FARM PROJECT — JI A1 STORAGE FACILITY SCALE — 1:1000 PLAN / 1:200 SECTION DATE — 2026-05-10 · DRN BY · CVC PE PEB 5376 · CIVIL · QP-S · SIGNED · SEALED
SHEET 02/14 · JI TANK FARM PACKAGE PEB 5376 SEAL CHECKED · 2026-05-10 APPROVED · QP-S

Project on Jurong Island? Send the brief.

Address (or JTC Plot ID), scope, target submission date. We reply within one working day with a written quote and the JTC + BCA + NEA submission roadmap.