Landed home A&A — 2-storey rear extension, District 11
PE endorsement and BCA Building Plan submission for 80 m² rear extension to existing 1990s landed home. Includes structural opening at GF and new RC slab to F1.
Reference list of CVC Engineers' Singapore Professional Engineering work — PE endorsements, BCA Building Plan submissions, regularisations, Periodic Structural Inspections, ERSS endorsements, and temporary works. Filterable by service type, area, year, and status. Every project carries the QP-S signature under PEB Reg No 5376.
PE endorsement and BCA Building Plan submission for 80 m² rear extension to existing 1990s landed home. Includes structural opening at GF and new RC slab to F1.
Retrospective BCA approval for unauthorised loft mezzanine in 5-room HDB. Pre-sale clearance triggered by buyer's lawyer compliance check.
CORENET-X Building Plan submission for 8-storey commercial new build with 2 basement levels. Includes ERSS adjacent to Tanjong Pagar MRT — LTA RP clearance handled.
5-level basement excavation, 22m deep diaphragm wall, 5 strut levels. LTA Railway Protection clearance for adjacent EWL alignment. Twice-daily I&M monitoring.
Periodic Structural Inspection of 12-storey commercial block. 6 defects mapped, 2 priority rectification items. PASS with conditions; report lodged via CORENET-X.
Tube-and-coupler scaffolding endorsement to SS 280. 24m high, 12 lifts, tied at every floor. Project duration 4 months; daily MOM-compliant inspection.
Rush 3-day assessment for buyer's lawyer pre-OTP exercise. Identified 2 unauthorised structures + 1 foundation settlement. Risk grade: AMBER. Buyer negotiated SGD 18k off SPA.
Portal frame structural endorsement for 30m clear-span warehouse extension. UB 533×210×82 rafters, UC 305×305×97 columns, eaves haunches with M24 8.8 bolts.
URA Conservation + BCA retrospective approval for 2-storey rear extension to 1920s shophouse. Required URA Conservation clearance before BCA submission.
8m sheet pile shoring for utility chamber excavation. 2-level strutting. Adjacent HDB block monitored with settlement markers throughout.
PE endorsement for shophouse F&B fit-out: structural opening for kitchen, mezzanine bar, exhaust hood loading review. URA + BCA + NEA clearance.
JTC + BCA + NEA + SCDF multi-authority submission for 5-tank chemical storage facility. Bund containment to NEA 110% rule. Pipe-rack support PE.
Periodic Structural Inspection of 18-storey HDB block. 4 minor defects, 1 lift core damp. PASS. Town Council appointed; report submitted to BCA.
Full PE endorsement for 3-storey landed home with single basement. RC frame + steel mezzanine in family room. Includes ERSS for basement excavation.
Hoarding endorsement for 60m construction site frontage along Cecil Street. Gantry over pedestrian way. LTA road occupation permit support.
Retrospective JTC + BCA approval for unauthorised steel mezzanine in JTC industrial unit. RC slab on steel beam supports. Fire-rated to 60 min.
Pre-purchase assessment for 1928 conservation shophouse. Structural defects, façade attachment review, URA Conservation compliance check. Risk: AMBER.
CBP wall + 3-level strut system for B1 carpark excavation. Adjacent to existing condo blocks; settlement monitoring on 6 reference points.
PE endorsement for full external curtain wall replacement on 1995 condo block. Façade attachment redesign + thermal performance upgrade. Phased works approval.
Retrospective approval for unauthorised roof terrace pergola enclosure. Structural reinforcement of original RC roof slab + new façade glass.
PE endorsement for 6-storey commercial office. RC frame, 9m × 9m grid, 2,400 m² GFA. Includes M&E coordination with curtain wall thermal break.
5-yearly PSI of two adjacent JTC warehouse blocks. Roof truss inspection, racking attachment review, dock leveller foundation check. PASS.
PE review of plant room slab loading for new chiller installation. RC slab strengthening with steel beam underpinning. Crane lift coordination.
Tower crane base + pile mat design for 60T tower crane on hotel site. RC pile cap on 4 bored piles. Site duration 18 months.
Retrospective approval for unauthorised rear extension to terrace HDB. Structural review of RC slab + roof tile addition. Cleared with HDB MA approval.
Structural strengthening of 1960s community hall. CFRP wrapping to RC beams + new cross-bracing to roof truss. Phased works during operations.
Extension of existing pipe-rack steel structure for new product line. CC3 consequence class, pipe loading + thermal expansion. JTC + BCA submission.
5-yearly PSI on row of 4 conservation shophouses. Detailed façade assessment + URA Conservation compliance verification. 2 minor rectification items.
Full CORENET-X BIM submission for 5-storey strata residential. BCA + URA + SCDF + NEA + PUB integrated review. 24-unit development.
22m diaphragm wall excavation 18m from existing MRT tunnel. LTA Railway Protection clearance, real-time monitoring, twice-daily readings, weekly LTA review.
30 of 500+ projects shown. The complete CVC Engineers reference list is available on request — categorised by service type, year, area, and value. Email stephen@cvcengineers.com for the full PDF portfolio or your specific reference vertical.
Address, scope, target submission date. Written quote in one working day.